Brickcoba water proofing over terrace
We do terrace water proofing work with broken bricks and chemical additives providing proper slope for rain water disposal.
|
 |
| |
|
Net Safety
For safety measures netting is provided to work fearlessly on heights. |
 |
| |
|
Proper Layout and Escavation
RCC multistory columns foundation escavation is done properly to maintain layout and minimize sand falling by providing PCC over ground. |
 |
| |
|
Column Foundation
Placement of columns tor steel and raft tor steel is done properly by providing spacer cover blocks. |
 |
| |
|
RCC Treatment
Water pond curing is done on RCC slab to achieve maximum compressive strength. |
 |
| |
|
Column foundation on Rock
Column foundation work on rock is done as per sections. |
 |
| |
|
Strengthening of RCC Columns
Strengthening of RCC Columns work is been done under consultation of structural engineers. |
 |
| |
|
Placement of Tor Steel in Curve Beams
Proper placement of tor steel is been done in typical curve beam designs as per structural drawings. |
 |
| |
|
Chemical Anchor Bolt Work
Chemical anchor bolts is been provided for canteliver beams in steel bracket.. |
 |
| |
|
Curve Moulding in RCC
Custom made shuttering is used for RCC moulding in canteliver Balconies etc. |
 |
| |
|
Deck Slab
Deck slab work is done to simplify and minimize deshuttering time. |
 |
| |
|
Rebaring in RCC
retrofitting, reinforcing bars in concrete for lintels. |
 |
| |
|
| Placement of concrete by Concrete pump |
 |